Pedley Mountain 173.5 Ha
Requires drilling. Post independent review of the Pedley deposit the QP geologist stated,
“The Pedley Mountain barite bearing structure is known to be 200m on strike, with a possible strike distance of 1,200m. It is also known to be 100m on dip, with sub-crops further downdip suggesting a total dip length of 150-200m. Consequently, the barite resource available at this prospect could be quite large.” (Source: 2014 NI 43-101, Randy Henkel P.Geo)